Hunter Army Airfield Hangar
Parking Garage Restoration
Airfield & Runway Restoration
Commercial Building Restoration
Waterproofing
Air Barriers
Fire-Stopping
Expansion Joints
Caulking & Sealants
Roofing
Hunter Army was a joint venture project consisting of a 119,500 square foot, six-bay helicopter maintenance hangar. Foxhill installed fluid-applied air barrier and self-adhered transition membranes on exterior walls and soffits. Self-adhered air barrier was installed on roofing surfaces. Foxhill also performed pre-applied blindside waterproofing, joint sealants, and airfield joint sealants. This job required certified ABAA installers. In addition to the 119,500 square foot hangar, the Hunter Army project also included the construction of a massive airfield. Foxhill installed pavement compression seals at the airfield, as well as performing site sealants and saw cutting.
Savannah, Georgia
Poettker Construction Company & Zodiac Inc.
$966,623